![Eaton US-S ESF30 28-P Mounting And Operating Instructions Download Page 38](http://html1.mh-extra.com/html/eaton/us-s-esf30-28-p/us-s-esf30-28-p_mounting-and-operating-instructions_525375038.webp)
38
4 Construction and Function
Mounting and Operating Instructions CEAG Central Battery System ZB-S 40071860179 (L) November 2018 www.ceag.de
ATTENTION!
Only fuses approved by CEAG
Notlichtsysteme GmbH are permit-
ted to use.
SKU CG-S 2x3A
Fuses
On the front panel of the change-over module there are
O
O
per circuit
O
O
3 output fuses 5 AT / 250 V.
The nominal current should not exceed 3 A per circuit!
Fuse dimensions: 6.3 mm x 32 mm, sand filled.
Order no.: 400 71 689 047 / 10 qty./unit
Operation elements
O
O
Service-PIN
Beside the „Service“ lable there is a button which must be
operated when the system´s basic program is loaded. The
basic programming occurs factory made.
1
)
Indicators
O
O
ON LED
The LED lights up when the voltage is present at the output
terminals.
O
O
Fault LED
The LED lights up, when one or more luminaires are faulty.
Additional Features
O
O
Mixed operation of
maintained light, non-maintained light and switched
maintained light in one circuit by using of CEAG EVGs/modules
with CG-S marking can be programmed without any additional
data cable.
O
O
Individual monitoring of
up to 20 luminaires per circuit
O
O
Individual switchin each circuit
O
O
Separate fusing for mains and battery operation
O
O
Among unipolar earth connection
in AC operation fault free DC operation can continue
O
O
Easy access to fuses
O
O
Separate savings for
mains and battery operation
O
O
Connected rating per circuit
660 W
O
O
Inrush current per circuit
250 A/ms
O
O
Typical change-over time
AC on DC = 450 ms
Components for circuit change-over module
SKU 2 x 3 A CG-S
O
O
(2 circuits each 3 A rated current)
O
O
The current module is connected to the controller via the BUS.
O
O
At the device configuration an address is allocated via the
controller. This occures factory made.
O
O
All functions as switching mode, monitoring function can be
programmed via the controller.
O
O
Will the circuit change over module be refitted or replaced
the programming must be changed.
1
2
3
4
1
2
3
4