UPS SYSTEM INSTALLATION
Eaton
Power Xpert 9395P UPS (300 kVA, 300 kW) Installation and Operation Manual
S
P-164000563 Rev 1
www.eaton.com/powerquality
4-4
3.
Remove the three bolts securing the right side shipping bracket to the cabinet
and three bolts securing the bracket to the pallet (see Figure 4‐2). Remove the
right side shipping bracket.
Shipping Bracket Bolts
Shipping Bracket Bolts
Pallet
Right Side
Shipping Bracket
Front Door
Figure 4‐2. Removing the ISBM Section Right Side Shipping Bracket
4.
Using a forklift (see the caution statement at the beginning of this procedure),
raise the cabinet until the cabinet bottom clears the pallet by approximately
3 mm (1/8
”
).
5.
Pull the pallet from under the cabinet. Discard or recycle the pallet and shipping
brackets in a responsible manner.
6.
Carefully lower the cabinet until the cabinet base contacts the floor.
7.
If installing an FI-UPM, go to the next section. If installing a battery system, go to
paragraph 4.4. Otherwise, go to paragraph 4.5 to complete the wiring of the
UPS.