16
GREEN MOTION DC 22 EV CHARGER INSTALLATION MANUAL
MN192004EN November 2022 www.eaton.com
00 Title
Drilling holes in the metal housing or making any modifications not described or approved in this document
will void the product warranty.
Follow these steps to install the unit onto the wall:
Step 1.
Place the four gaskets on the back of the charging station.
Figure 9. Details of gaskets on the back of the EV charger with dimensions
Step 2.
Install the four selected screws with flat washers into the wall, leaving them to protrude 10 mm from
the surface (see Figure 10).
Step 3.
Mount the unit onto the screws, temporarily using them as holders.
Figure 10. Installation site with the protruding screws
35 mm (1.4 inch)
440 mm (17.3 inch)
45 mm (1.8 inch)
49 mm
(1.9 inch)
532 mm (20.9 inch)
7.0 mm
(0.3 inch)
14.5 mm
(0.6 inch)