GREEN MOTION DC 22 EV CHARGER INSTALLATION MANUAL
MN192004EN November 2022 www.eaton.com
00 Title
Figure 33. Location of the screw at the bottom of the unit
Figure 34. Open front door of the unit
Step 2.
Unscrew the screw located on the bottom-right side of the EV charger using the T20 screwdriver.
Step 3.
The front door can be opened sideways.
8.2 How to set the unit as out of order
The Green Motion DC 22 EV charger can be set as out of order by following the steps below:
1. On site method: Press the emergency stop button.
2. Remote method: Access the Eaton Charging network manager and set the unit as out of order.