4.
Preparation
4.1
Unpack and inspect equipment
Unpack the equipment and inspect it carefully for possible damage that may have occurred while in transit.
Report any damage immediately, using a completed Equipment Incident Report on page??
Keep the original packaging to use if any item needs to be returned for replacement or repair.
4.2
Cautions
Before commencing installation, review the Warnings and Cautions on page6.
5.
Install cabinet
5.1
Overview of tasks
Task Description
Reference
1
Concrete foundation
See details on page 16
.
2
Bolt down Cabinet
See details on page 19
.
3
Fit air conditioner roof (if required).
See details on page 20.
4
Fit heat exchanger door (if required)
See details on page 20.
3
Bring in cables.
See details on page 20
6
Install equipment
See details on page 22 .
Power up cabinet
See details on page 22.
5.2
Concrete foundation
Step 1 - Establish a safe working area around the site
Use approved road traffic management protocols, barriers and signage to safeguard the
people working at the cabinet, road users and pedestrians.
Step 2 - Check clearances
The site selected for the cabinet must have adequate clear space around the cabinet for
access and/or ventilation.
Refer to
Figure 4
for clearances needed.
Check there are no cables or pipes below the site that may be damaged by excavation work.