background image

5

XSTORAGE HOME POWER METERS MANUAL

   MN700001EN   March 2019   www.eaton.com/xstorage

Figure 7: SFERE power meter wiring terminals

Figure 8: Connection of the RS845 terminal block 

connector to the RS-485 port of the hybrid inverter

Beside the L and N connections, the power meter must be 

connected to the xStorage Home system via the RS-485 

communication cable (Figure 7), to enable real-time input 

of the monitored data into the xStorage Home system. 

This is possible through the RS-485 port. Data sent through 

this port is utilized by the xStorage Home User Interface (UI) 

to record the event history and to display the current energy 

consumption of both the critical and non-critical loads, as well 

as to track the PV-generated energy (as applicable).
The general wiring of the power meter is illustrated in 

Figure 7:

• 

References 58 and 59 identify the RS-485 connection 

terminals;

• 

References 47 and 48 identify the pulse terminals (not used 

for this product);

• 

References 1 and 2 identify the line connection terminals;

• 

References 3 and 4 identify the neutral connection terminals.

The hybrid inverter RS-485 port terminals are located in the 

communication slot that is highlighted by the arrow pointer in 

Figure 8. Please note that up to two devices (in this case, 

two power meters) can be connected through the hybrid 

inverter’s RS-485 port.

Summary of Contents for Eastron SDM120CT

Page 1: ...xStorage Home Power Meters Manual For 4 2 kWh 6 kWh and 10 kWh systems capacity This document is intended for Eaton certified installers xStorage Home...

Page 2: ...know 3 3 SFERE DDS1946 DS Technical specifications installation and wiring 4 4 SFERE DTS1946 DS Technical specifications installation and wiring 8 5 Eastron SDM120CT Technical specifications installat...

Page 3: ...ustomer service we provide all specifications contained in this document are subject to change with due notice All drawings descriptions or illustrations contained in this document serve to provide a...

Page 4: ...nterface 2 the energy pulse indication light 3 the menu navigation keys 4 the model number Figure 3 SFERE DDS1946 DS product dimensions Figure 4 DIN rail mounting style overview Figure 5 Terminal wiri...

Page 5: ...UI to record the event history and to display the current energy consumption of both the critical and non critical loads as well as to track the PV generated energy as applicable The general wiring of...

Page 6: ...r both power meters with the exception of their assigned addresses Enter the programming mode as described 1 Power up the meter and irrespective of the measurement message displayed see display exampl...

Page 7: ...interface Please follow the instructions provided in the complementary xStorage Home user interface onboarding process manual 6 Again press to enter the third level menu This will display the default...

Page 8: ...re required The meter connection terminals must be directly connected to the L1 L2 L3 lines and N neutral wires Figure 16 L1 L2 L3 and N left side in the diagram is the side connected to the xStorage...

Page 9: ...id inverter The wiring of the RS 485 port terminals of the hybrid inverter and the power meters terminals is illustrated in Figure 19 Connect the RS 485 terminals of the power meter to the RS 485 term...

Page 10: ...ensure the activation of the correct measuring mode and the correct communications flow to the xStorage Home system i e to its hybrid inverter unit The following illustrations explain the communicatio...

Page 11: ...ied data and return to second level menu or b and at the same time to cancel the data modification and return to the second level menu 9 Press and to return to the first level menu i e the communicati...

Page 12: ...mpact electrical distribution box Figure 24 Figure 24 DIN Rail mount for Eastron meter During the installation of the power meter no additional protective devices are required The meter connection ter...

Page 13: ...appropriate meter is selected from the user interface The procedure starts with EM2 and then needs to be repeated for EM1 Please refer to the xStorage Home user interface onboarding process manual to...

Page 14: ...he power meter no additional protective devices are required The meter connection terminals must be directly connected to the L1 L2 L3 lines and N neutral wires The split core CT is installed on the L...

Page 15: ...r the correct password default 1000 before processing From the set up menu use the M and P buttons to select Address ID Press the Enter button to enter the selection routine The current setting will b...

Page 16: ...e la Longeraie 7 1110 Morges Switzerland Eaton com xstorage 2019 Eaton All Rights Reserved Publication No MN700001EN CSSC 1503 March 2019 Eaton is a registered trademark All other trademarks are prope...

Reviews: