Data-Voice-Video 3G Power Solutions (UL-Listed Models)
32
Copyright © 2011 Eaton Corporation. All Rights Reserved.
IPN 997-00012-82B May 2011
Step 3 - Terminate common (positive) cables
1
Run a common (positive) battery cable link internally from the first battery rack
to the rectifier rack.
2
Bolt the ring crimp lugs to the positive busbar in the battery rack and the
common (positive) busbar in the rectifier rack. Use 3/8" bolts, nuts, spring
washers and flat washers.
3
Torque to 18.7 - 21.9Nm (166 - 194 inch-pounds).
Step 4 - Terminate live (negative) cables
1
Run a live (negative) battery cable link internally from the first battery rack to the
rectifier rack.
2
Bolt the ring crimp lugs to the live (negative) busbar in the battery rack and the
live (negative) busbar on the contactor in the rectifier rack. Use 3/8" bolts, nuts,
spring washers and flat washers.
3
Torque to 18.7 - 21.9Nm (166 - 194 inch-pounds).
Step 5 - Repeat for second battery rack (if required)
If required, repeat the process to connect the busbars of a second battery rack on the
opposite side of the rectifier rack.
Step 6 - Repeat for other battery rack(s) (if required)
If required, repeat the process to connect the busbars of any other battery rack(s) to
the adjacent battery rack.
Procedure complete