![Eaton CEAG LP-STAR Mounting And Operating Instructions Download Page 25](http://html1.mh-extra.com/html/eaton/ceag-lp-star/ceag-lp-star_mounting-and-operating-instructions_3833622025.webp)
25
Mounting and operating instructions compact emergency power supply CEAG LP-STAR
40071860247 (L) September 2018 www.ceag.de
5 Setting up and installation
5 .3 Connecting the batteries
IP 20 Version
1
a
b
c
2
3
NOTE!
Sequence for connecting battery string 1:
• Connect the cable marked with “+” to the plus pole of the
battery
a
an (string 1 in the picture
1
).
• Connect the cable marked with “-” to the minus pole of
the battery
b
.
• Finally close the bridge
c
.
• Then connect the other battery strings in the same way,
see pictures
2
,
3
and
4
.
When disconnecting the battery power supply the same
sequence applies in reverse
3
4
String 1
String 1
String 1
String 1
String 2
String 2
String 2
String 3
String 3
String 4
String 1
String 1
String 1
String 1
String 2
String 2
String 2
String 3
String 3
String 4
String 1
String 1
String 1
String 1
String 2
String 2
String 2
String 3
String 3
String 4
String 1
String 1
String 1
String 1
String 2
String 2
String 2
String 3
String 3
String 4
1
2
IP 54 Version
a
b
c
ESF30 Version
12Ah
String 1
24Ah
String 1
String 2
36Ah
String 1
String 2
String 3
48Ah
String 1
String 2
String 3
String 4
1
2
3
4
a
b
c