8 Operating
MANUAL CEAG AUtoMAtiC tEst systEM At-s
+
40071860177 (C) December 2016 www.ceag.de
8 .4 .3 Menu 3: “Basic settings”
Overview:
Main menu
Test & status menu
Block,reset
Basic settings
DLS/TLS Setup
Circuit setup
Luminaire setup
Memory card
Menu 3
Language
Date & time
Functiontest
Delay time mains return
Manual reset
Selective EmgcyOper.
Relay setup
Buzzer setup
Display setup
Timer setup
Substation setup
Connection to BMS
Function keys
Optional inputs
Serialnumber & type
Password protection
Daylight saving time
Service info
Selection of
menu options
with the
keys
<ok>:
confirm selec-
tion
<Menu>: can-
cel and return
to the previous
menu (any
changes
entered are
saved)
<ESC>: cancel
and return to
the previous
menu (any
changes en-
tered are not
saved)
flashing input
prompt
Setting the system time (current date and
time) for the internal clock of the CU S
+
control module.
AT-S+ autosync:
program to „yes“ only at one station of a
group All other stations are synchronised
daily via this.
Use the
keys to toggle between
“Language: National language”
2
)
and “Language: english”
Finish and return to Menu 3 with
<Menu>
2
) Can only be selected when memory
card is inserted.
Setting the start (date and time) of the
first function test and the intervals (1 to
14 days) of subsequent function tests
(factory setting: all 7 days).
Setting the start-up time of the FT in 5s
steps (factory setting: 300s)
For all luminaires with “End of line” cut
off (EoL).
<ok> The currently selected
Menu 3.1: language is displayed
1
)
1
) Setting on delivery/initial commission-
ing
<ok>
Menu 3.2:
<ok>
Menu 3.3:
Important note!
These settings are the basis for all
log book entries and (synchronised)
test of the system!
Important note!
For synchronized date, time and the
function test all distributor in Mas-
ter/Slave modus must programmed
and connected with a CG-S bus line.
ATTENTION!
In the operation mode Master/Slave you
can not connect a CGVision.
Date & Time
We 11.01.12 12:00
AT-S+ autosync.: yes
F-Test Date&Time
We 05.12.12 12:00
FT start-up time 300s
Interval in days: 07
Note!
Fall back language for controller re-
set or after the installation of a new
CU S
+
is allways english
Select the date and time positions
with
Change with
Finish with <Menu>
This request follows:
Enter “OK” synchronises the clock
of all connected substations in one
group
Substation
synchronise ?
Menu = no OK = yes
Substation
synchronise ?
Menu = no OK = yes
Select the input position for date,
time, intervals (in days) and FT start-up
time (in 5s) with
Change with
Finish with <Menu>
This request follows:
Language
Date & time
Functiontest
Delay time mains return
etc.
Language
Date & time
Functiontest
Delay time mains return
etc.
Language
Date & time
Functiontest
Delay time mains return
etc.
Language
Date & time
Functiontest
Delay time mains return
etc.
Setting the time (1 ... 99 minutes) which
the emergency light remains on after mains
supply is restored.
Select 1 ... 99 minutes with the keys
Finish and return to Menu 3 with
<Menu>
<ok>
Menu 3.4:
Delay time on mains
return in
minutes 10