12
4. Construction and Function
MANUAL CEAG AUtoMAtiC tEst systEM At-s
+
40071860177 (C) December 2016 www.ceag.de
4. Construction and Function
4.1 Example of Control Cabinet-Construction
(AT-S
+
C30)
Lütze mounting system
Circuit switching modules
30 x SU-S
+
2 x 6 A
6-fold mains distribution
box D02 16 A
Cable infeed from above
Triple deck tension
spring installation termi-
nal with neutral wire
disconnect terminal
Control unit CU S
+
DC/DC converter.2
AC module
Fuse circuit breaker D02
35 A per field
Fuse circuit breaker
NH 00
Cable infeed from below