Commissioning
Complete the tasks in this appendix only if a formal commissioning test is required.
Before starting these Commissioning tasks:
•
Complete all the Installation tasks (see details on page
•
Complete all the Start-Up tasks (see details on page
•
Save a copy of the configuration file.
Complete the Commissioning tasks in the following order:
During the testing, note any changes to the configuration file that are incorrect.
Task Description
Reference
1
Analog Inputs
See details on page
2
System Controls
3
System Alarms
4
Digital Inputs
See details on page
5
Digital Outputs (Relays)
See details on page