Maintenance
Copyright © 2007-2010 Eaton Corporation. All Rights Reserved.
IPN 997-00012-52D July 2010
59
Step 2 - Align the rectifier with the guides
Step 3 - Push in the rectifier
1
Push in the rectifier until the retaining screw contacts the shelf.
2
Check the rectifier's rear connector is correctly aligned with the shelf connector,
or damage may occur.
3
Tighten the retaining screw to 1.5Nm (13.3 inch-pounds). This will locate the
rectifier in its rear connector.
4
Check that the rectifier’s Power On LED turns on (after the startup delay) and the
alarm LEDs turn off.
The rectifier will automatically register with the system controller and download
its operating parameters. No adjustments are required.
Procedure complete
Replacing or Adding a Load circuit breaker
Step 1 - Remove dc circuit breaker cover
See the diagram on page
.
Step 2 - Remove existing circuit breaker (if required)
Pull circuit breaker forward to remove.
Step 3 - Plug in new circuit breaker
Remove circuit breaker blank panel if fitted.
Follow the procedure on page
. See Spare Parts on page
for available types and
part numbers.