Chapter 3
Installation
Copyright © 2007-2010 Eaton Corporation. All Rights Reserved.
IPN 997-00012-52D July 2010
13
C
h
a
p
t
e
r
3
Installation
Overview
Topic Page
Task 1 - Check the AC Supply and Grounding
Task 3 - Mount the APS in the Rack
Task 4 - Connect External Input/Output Cabling (if required)
Task 5 - Connect the DC Load and Battery Cables
Task 6 - Install the Batteries
Task 7 - Mount the Battery Temperature Sensor
Task 8 - Connect the AC Supply Cable
Task 9 - Connect to the AC Supply Point