background image

Dream

 TENT TOP Step #17

Drape tent top over TS2464 
tent support than over and 
under TR2464 tent rail. Install 
with 4 - 2” screws in holes 
provided on tent top

.

 (as shown 

in photo)

Do the same thing to the other 
side of tent top screw into 
TR2464 tent rail using 4 - 2” 
screws

.

 (as shown in photo)

Dream JACOB’S LADDER Step #18

Layout 6 - JD2426 Jacob Ladder 
Rungs and 3 - ropes (16’ sections)

.

 

(as shown in photo)

Thread rope through Jacobs 
Ladder top rail JT4484 and knot 
on the top 

.

(as shown in photo)

Thread 3 ropes through first 
JD2426 Jacobs Ladder rung and 
tie a knot approximately 12” down 
from top rail 

.

(as shown in photo)

Continue 
installing other 5 
JD2426 Jacob 
Ladder Rungs 
using the same 
process all the 
way down the 
ropes 

.

(as shown 

in photo)

Place ropes through JB4458 
Jacobs Ladder Bottom Rail pull 
tight and tie knots 

. Cut off any excess rope. 

(as shown in 

photo)

Summary of Contents for Dream

Page 1: ...o be used exclusively for Eastern Jungle Gym customers only It is not to be handed out to the general public Any duplication of this booklet will be subject to copyright protection and federal laws Dream Creating Childhood Memories R Last revised 3 30 2016 ...

Page 2: ...Eastern Jungle Gym from It is important for you to go through your boxes and check all material hardware and wood prior to building So that you can familiarize yourself with the material Also it is very helpful to read and look over this instruction booklet This will help insure you build your Jungle Gym properly safely and more efficiently A little time now can save you time when your building Cr...

Page 3: ... other than sitting on swings is dangerous and can cause serious injury Never stand or kneel on swings 11 Warn children to not loop chains over any object this can cause the chain to weaken 12 Children should not wear any loose clothing while playing such as scarfs and hats with strings or any other very baggy clothes This can cause tripping hazzards Choosing a Location to Build your Eastern Jungl...

Page 4: ...fter throughly reading all your information and have located your swing set site Carefully unpack all your parts NOTE keep check list close by Remember that a little time familiarizing your self with the parts and instructions before you begin will help you avoid mistakes and save time later Here are some maintenance tips that must be done to ensure safe play 1 At the beginning of each play season...

Page 5: ...s 1 10 Wave Slide Ladder Rungs Bag of 12 Rocks with Hardware 2 Green Sling Swings 2 pair Safety Grab Handles 3 16 Sections Rope 1 Ring Trap Combo Items not shown 1 Tent top 1 Binoculars 1 Captains Ships Wheel 1 Swing Beam Support Brace Creating Childhood Memories R ...

Page 6: ... ASSEMBLY All Recessed holes must be piloted with 1 4 drill bit to help minimize splintering All lag bolts must be accompanied with a washer before driving in lag bolt Now you are ready to begin assembling Creating Childhood Memories R ...

Page 7: ...oles in R2455 should face the inside of box The counter sink holes on GS2455 should face outside of box Measure from corner to corner on each side of ground support base Make sure your measurements are the same This will square of base R2455 GS2455 3 5 R2455 R2455 G S 2 4 5 5 G S 2 4 5 5 R2455 R2455 G S 2 4 5 5 G S 2 4 5 5 1 3 lag in each corner Countersink Holes Countersink Holes Layout ground su...

Page 8: ...l 4 posts NOTE Mark the longer side with an X Now place PT246 floor teak supports over X with edge on line drawn Install with 2 3 lags Continue on all 4 posts NOTE The 36 side is the TOP of post mark with an O Post complete continue to next page for post installation on clubhouse X X O O O O O O O X X P4496 PT246 36 36 Dream POSTS Assembly Step 2 ...

Page 9: ...oto Using first post as a guide place level on PT246 floor teak mounted on post Dig down second post until level with first post Again fasten with 4 3 lags in holes provided Continue this process until all 4 post are fastened NOTE Make sure the O is always on the top of post and 2x4 teak is facing inside of clubhouse NOTE If installing on unlevel ground place first post in lowest corner of ground ...

Page 10: ...he photo R2455 FJ2455 3 5 1 3 lag in each side R2455 FT2455 F J 2 4 5 5 Stand up floor joist on end and install with 1 3 lag through FJ2455 into R2455 Use the 3 and 5 marks you made earlier as guides NOTE The counter sink holes in R2455 should face the inside of box The counter sink holes on FJ2455 should face outside of box NOTE Center countersink hole on FJ2455 should be at the top of joist see ...

Page 11: ...level NOTE Make sure floor orientation match ground support base orientation when placing floor on post Pull post tight to floor making sure that the floor is resting on 2x4 teaks Now install with 2 3 lags in each corner From under the clubhouse lag the floor into post in all four corners using 2 3 lags Clubhouse floor is completed ...

Page 12: ...n top and bottom Make sure you level your tent support 4x4 before installing lags SLIDE Wall WR2496 R2429 T S 4 4 7 6 20 Layout 3 WB54432 wall boards on the inside of clubhouse against rails just installed Measure 3 in from TS4476 tent support and install your first wall board With 1 screws Now measure 3 in from P4496 post and install second wall board with 1 screws Now install your last wall boar...

Page 13: ...the center of WR2496 and to the center of WR2455 Using 2 3 lags top and bottom Make sure you level your tent support 4x4 before installing lags T S 4 4 7 6 Layout 6 WB54432 wall boards on the inside of clubhouse against rails just installed Measure 3 in from TS4476 tent support on each side and install your first two wall boards With 1 screws Now measure 3 in from each P4496 post and install third...

Page 14: ...t and flush with bottom of floor and rail just installed as shown in photo Install with 2 1 screws on top and Place wall board GH2436 from outside of clubhouse 1 in from wall board WB54436 and flush with bottom of floor and rail just installed as shown in photo Install with 2 2 lags on top and bottom Place wall board GH2436 from outside of clubhouse 1 in from wall board WB54436 and flush with bott...

Page 15: ...encil where to drill holes After you have marked desire location remove rocks and drill holes using a 3 8 drill bit After you have drilled out all the holes you can start rock installation Continue decking your rock wall using FB54648 until it is completed as shown in photo Install using 2 screws The RWJ2470 will extend past decking Place 12 rock hand holds in desired location on decking of rock w...

Page 16: ... opening Hold top of rock wall flush with top of floor as shown in photo From under the clubhouse fasten rock wall to post using 1 3 lag on each side as shown in photo Rock wall complete Dream ROCK WALL installation Step 10 70 ...

Page 17: ...lush with edge of post and fasten with 2 3 lags Place clubhouse center rail SP4436 flush with top of rail and fasten with 2 3 lags Fasten clubhouse center rail SP4436 flush with 2 3 lags from under deck W B 5 4 4 3 2 Place wall board Wb54432 from outside of clubhouse 3 in from post and flush with bottom of floor and rail just installed as shown in photo Install with 2 1 screws on top and bottom ...

Page 18: ... 6 rungs are screwed in Ladder is now complete Install JB4458 Jacobs Ladder Bottom rail to the ladder Make sure to leave 3 overhang on the right side of ladder and flush with the bottom Notice all holes are facing UP Jb4458 3 Using holes provided install 2 5 lags on each side 3 Dream LADDER Installation Step 14 Place ladder into front opening Hold top of ladder flush with top of floor as shown in ...

Page 19: ...installing Wood Roof ADD ON Skip Step 17 and go to Wood Roof ADD ON manual Tent Top Rail Mount first TR2464 tent rail across the wall top rails Above the rock wall Install with 1 3 lag on each side as shown in photo Mount second TR2464 tent rail across the wall top rails Above the ladder Install with 1 3 lag on each side as shown in photo Mount Ts2464 Tent Support on top of TS4476 install with 1 3...

Page 20: ... JD2426 Jacob Ladder Rungs and 3 ropes 16 sections as shown in photo Thread rope through Jacobs Ladder top rail JT4484 and knot on the top as shown in photo Thread 3 ropes through first JD2426 Jacobs Ladder rung and tie a knot approximately 12 down from top rail as shown in photo Continue installing other 5 JD2426 Jacob Ladder Rungs using the same process all the way down the ropes as shown in pho...

Page 21: ...NG BEAM Assembly Step 19 Layout CB46114 Swing Beam on the ground Place swing hangers on beam using hardware provided 12 3 8 Hex Bolt 6 24 3 8 Washer 12 3 8 Nut 6 Swing Hangers Holes are pre drilled for placement ...

Page 22: ...igging in the side support legs Install swing beam into TS4476 tent top support of clubhouse as shown in photo Countersink two holes into end of beam using a 7 8 spade bit Install 2 5 Lag bolts through beam into TS4476 Doing the same process but from other side countersink two holes in TS4476 and bolt through TS4476 into swing beam using 2 5 Lag bolts T S 4 4 7 6 Swing Beam 7 8 Counter Sink Holes ...

Page 23: ...or where slide opening is using 2 screws as shown in photo Position slide in slide wall opening Make pilot holes in the slide with 1 4 drill bit and install using 2 Screws and cup washer as shown in photo Dream SLIDE Installation Step 21 ...

Page 24: ... on wall next to slide opening as shown in photo Use the hardware provided for Congratulations you are Finished Dream Accessory Installation Step 22 Install grab handles as needed above rock wall and ladder Or Measure up from floor decking approximately 6 make a mark This is where the bottom hole of the grab handle will be ...

Page 25: ...uct Satisfaction ___ Excellent ___ Good ___ Fair ___Poor Instruction Satisfaction Comments I have read the owners manual and understand my responsibility to maintain my Jungle Gym accordingly and to instruct my children of proper play and safety procedures I also understand that all children that utilize my play system are to be supervised at all times Signature ____________________________ Date__...

Page 26: ...In addition for a period of Fifteen Years from the date of purchase EJG warrants to ...

Page 27: ...ng any issues With your name address and contact number 2 Attach a copy of your sales receipt or other means of proof of purchase 3 Provide a photo of the part or parts for your warranty claim and a photo of the complete set NOTE Failure to follow these step may result in a delay of your claim Mail all information to Customer Service Eastern Jungle Gym 30 Commerce Dr Carmel NY 10512 Or email info ...

Reviews: