Place rock wall into back opening.
Hold top of rock wall flush with top
of floor (as shown in photo).
From under the clubhouse
fasten rock wall to post
using
1 - 3” lag on each side (as
shown in photo).
Rock wall complete!
Dream ROCK WALL installation Step #10
70