Dream ACTIVITY WALL #1 installation Step #8
Activity Wall #1
R2455
Place rail R2455 from inside clubhouse
flush with top of post and install with 2-3”
lags on each side.
Place wall board Wb54436
from outside of clubhouse
3½” in from post and flush
with bottom of floor and rail
just installed (as shown in
photo). Install with 2 - 1½”
screws
on top and bottom.
Place second wall board
Wb54436 from outside of
clubhouse 3½” in from post
and flush with bottom of floor
and rail just installed (as
shown in photo). Install with
2 - 1½”
screws
on top and
Place wall board, GH2436
from outside of clubhouse
1½” in from wall board,
WB54436 and flush with
bottom of floor and rail just
installed (as shown in photo).
Install with 2 - 2” lags on top
and bottom.
Place wall board, GH2436
from outside of clubhouse
1½” in from wall board,
WB54436 and flush with
bottom of floor and rail just
installed (as shown in photo).
Install with 2 - 2” lags on top
and bottom.
Activity Wall #1 Complete! Now time
to assemble and install your Rock
Wall!
W
B
5
4
4
3
6
W
B
5
4
4
3
6
G
H
2
4
3
6
G
H
2
4
3
6