FT2455
F
B
5
4
6
4
8
R2455
R2455
F
J
2
4
5
5
F
J
2
4
5
5
F
B
5
4
6
4
8
Dream FLOOR Assembly Setup #4
Measure 3½” and 5” in from each
corner of both GS2455’s (as
shown in photo).
Start decking your floor using
FB54648 one on each side of
floor frame (as shown in photo).
Install using 2” screws.
Continue decking your floor using
FB54648 until it is completed (as
shown in photo). Install using 2”
screws.
Turn floor over and screw
FT2455 to floor decking using 2”
screws (as shown in photo).
Layout floor joists
2 - FJ2455,
2 - R2455
(as shown in the photo).
R2455
FJ2455
3½ ”
5”
1 - 3” lag in
each side
R2455
FT2455
F
J
2
4
5
5
Stand up floor joist on end and install
with 1 - 3” lag through FJ2455 into
R2455. Use the 3½” and 5” marks
you made earlier as guides.
NOTE:
The counter sink holes in
R2455 should face the inside of box.
The counter sink holes on FJ2455
should face outside of box.
NOTE:
Center countersink hole on
FJ2455 should be at the top of joist
see photo to the left.
Install Floor teak FT2455 using hole provided with 1 - 3” lag. FT2455
will run in the flat and be flush with top of FJ2455. Make sure the
countersink screw holes on FT2455 are facing the ground.
FJ2455
FT2455
FT2455
R2455
R2455
F
J
2
4
5
5
F
J
2
4
5
5
1 - 3” lag in
each corner
Countersink
Holes
Countersink
Holes