Installation, Operation and Parts Manual
EE-C18E
14
Step
4:
Erect
and
secure
the
post.
1.Make
the
posts
face
to
each
other
and
the
distance
between
the
posts
equals
to
the
length
of
the
overhead
crossbeam.
Use
proper
means
to
eret
the
post.
2.
Check
the
position
of
the
base
plates
again.
3.
Drill
the
mounting
holes.
Remove
the
drilling
dust
from
the
hole.
4.
Use
a
spirit
level
to
check
the
vertical
alignment
of
the
posts.
If
necessary,
place
equalizing
plates
under
the
base
plates.The
equalizing
plates
must
be
of
the
same
length
as
the
side
of
the
base
plate
resting
on
them.
Otherwise
the
load
of
the
base
plate
will
not
be
transferred
evenly
to
the
foundation.
5.
Erect
and
secure
the
other
post
similarly.
Step
5:
Connect
crossbeam.
1.
Hex
nut
M14
6.Crossbeam
(in)
2.Flat
washer
M14
7.Hex
socket
cylinder
head
screw
M6*30
3.Spring
washe
M14
8.Hex
nut
M6
4.Hex
head
full
swivel
screw
M14*3
9.Protective
rod
5.Crossbeam
(out)
10.Extending
post
Summary of Contents for EE-C18E
Page 6: ...Installation Operation and Parts Manual EE C18E 6 1 4 Warning labels ...
Page 10: ...Installation Operation and Parts Manual EE C18E 10 3 4 Dimensions ...
Page 25: ...Installation Operation and Parts Manual EE C18E 25 Annex 2 Electrical schemes and parts list ...
Page 26: ...Installation Operation and Parts Manual EE C18E 26 ...
Page 27: ...Installation Operation and Parts Manual EE C18E 27 ...