Installation, Operation and Parts Manual
EE-C18E
13
4.3
General
installation
steps
ONLY
TRAINED
AND
QUALIFIED
INSTALLERS
CAN
PERFORM
LIFT
INSTALLATION
DUTIES.
Step
1:
Remove
the
packaging
and
take
out
the
accessories
attached.
Attention
:
The
packs
must
be
opened
adopting
all
the
precautions
required
to
avoid
injury
to
persons
(keep
at
a
safe
distance
when
cutting
the
straps)
or
damage
to
parts
of
the
machine
(be
careful
that
no
parts
are
dropped
while
you
are
opening
the
packing).
Use
proper
means
(put
something
supporting
under
the
post
or
suspend
the
post
by
a
crane)to
suspend
the
post,
unsrew
and
remove
the
bolts
fixed
on
the
iron
rack.
Attention
:
Please
pay
special
attention
not
to
let
the
post
fall
down
for
it
may
cause
casualty
or
bring
damages
to
the
accessories
fixed
in
the
post.
Step
2:
Fix
the
standing
position
for
the
two
posts.
(see
Annex
1,
floor
plan)
1.
Decide
on
which
post
the
power
unit
is
going
to
be
mounted.
2.
Draw
an
outline
of
the
base
plate
on
the
installation
ground
with
chalk
and
ascertain
the
position
for
the
two
posts.
Step
3:
Connect
extending
posts.
1.Hex
bolt
2.Iron
rack
1.Hex
nut
M14
2.Flat
washer
M
14
3.Spring
washer
M14
4.Hex
head
full
swivel
screw
M14*30
Summary of Contents for EE-C18E
Page 6: ...Installation Operation and Parts Manual EE C18E 6 1 4 Warning labels ...
Page 10: ...Installation Operation and Parts Manual EE C18E 10 3 4 Dimensions ...
Page 25: ...Installation Operation and Parts Manual EE C18E 25 Annex 2 Electrical schemes and parts list ...
Page 26: ...Installation Operation and Parts Manual EE C18E 26 ...
Page 27: ...Installation Operation and Parts Manual EE C18E 27 ...