Installation, Operation and Parts Manual
EE-C18E
16
2.
Connect
oil
hoses
to
the
“T”
connector
in
the
power
side
post.
NOTE:
make
sure
the
connectors
and
hoses
are
clean.
Step
8:
Connect
electrical
system.
Refer
to
Annex
2
before
doing
the
connction.
Read
the
name
plate
and
check
that
the
supply
voltage
is
adapted
to
the
voltage
of
the
lift.
1.Fix
max
height
limit
switch
onto
the
inside
surface
of
the
main
post
and
connect
its
wire
to
the
terminals
reserved
in
the
post.
1.
Oil
hose
1
2.
Oil
hose2
3.
Power
unit
4.
Oil
hose
3
5.
Oil
cylinder
1.
Max
height
limit
switch
2.
Cross
socket
cap
head
screw
M4*12
3.
Cross
socket
cap
head
screw
M4*25
4.
Wire
Summary of Contents for EE-C18E
Page 6: ...Installation Operation and Parts Manual EE C18E 6 1 4 Warning labels ...
Page 10: ...Installation Operation and Parts Manual EE C18E 10 3 4 Dimensions ...
Page 25: ...Installation Operation and Parts Manual EE C18E 25 Annex 2 Electrical schemes and parts list ...
Page 26: ...Installation Operation and Parts Manual EE C18E 26 ...
Page 27: ...Installation Operation and Parts Manual EE C18E 27 ...