Installation, Operation and Parts Manual
EE-C18E
24
Annex
1,
Floor
plan
Indoor
installation
only.
There
must
also
be
a
clearance
of
at
least
1
meter
between
the
lifting
platform
and
fixed
elements
(e.g.
wall)
in
all
lifting
positions.
There
must
be
sufficient
space
for
driving
vehicles
on
and
off.
C25/30
concrete
base
with
strength
more
than
3000psi,
Minimum
thickness
of
400mm.
Surface:
Horizontal
and
even
(Gradients
max.
0.5
%)
Newly
built
concrete
ground
must
be
older
than
20days.
In
mm.
Summary of Contents for EE-C18E
Page 6: ...Installation Operation and Parts Manual EE C18E 6 1 4 Warning labels ...
Page 10: ...Installation Operation and Parts Manual EE C18E 10 3 4 Dimensions ...
Page 25: ...Installation Operation and Parts Manual EE C18E 25 Annex 2 Electrical schemes and parts list ...
Page 26: ...Installation Operation and Parts Manual EE C18E 26 ...
Page 27: ...Installation Operation and Parts Manual EE C18E 27 ...