Page M-4
Repair and Service Manual
B
ELECTRONIC SPEED CONTROL
Read all of Section B and this section before attempting any procedure. Pay particular attention to Notices, Cautions, Warnings and Dangers.
and tighten set screw to 45 - 55 in. Ibs. (5 - 6 Nm)
torque.
Control Arm Link
Be sure that the control arm link (12) is parallel with the
bottom of the pedal box and tighten nuts (13) to 120 -
132 in. Ibs. (14 - 15 Nm) torque (Ref Fig. 4 on page M-
4). Apply a thin coating of white lithium grease to the slot
in the control arm link.
If control arm (14) has been removed from control arm
link (12), tighten nut (15) to 25 - 43 in. Ibs. (3 - 5 Nm)
torque and be sure that arm rotates smoothly on its
shaft.
If shaft (16) has been removed from pedal box, tighten
nut (17) to 120 - 144 in. Ibs. (14 - 16 Nm) torque.
Be sure accelerator pedal moves smoothly and acceler-
ator cable (7) pulls smoothly on governor arm (18) (Ref
Fig. 4 on page M-4).
Replace the cover on the pedal box. Tap lightly to set the
cover before installing screws. Replace the access
cover on the floor. Replace floormat and rocker panel.
Check wide open throttle adjustment. See 'ACCELERA-
TOR/ GOVERNOR CABLE ADJUSTMENT' on page M-2.
Fig. 4 Accelerator Linkage
Note: Tampering with, or removal of governor
seal by anyone other than authorized
Service or Branch personnel will void
warranty.
1 3/4"
(44 mm)
Pre-adjust
8
15
14
16
13
12
10
11
13
9
3
4
1
5
2
17
6
7
18
22
23
21
20
22
19
Summary of Contents for 625619 2012
Page 6: ...Page iv Repair and Service Manual NOTES TABLE OF CONTENTS ...
Page 181: ......