Page Q-2
Repair and Service Manual
B
WHEELS AND TIRES
Read all of Section B and this section before attempting any procedure. Pay particular attention to Notices, Cautions, Warnings and Dangers.
Follow all instructions and safety warnings provided by
the mounting/demounting machine manufacturer.
Wheel Installation
Do not tighten lug nuts to more than 85 ft. lbs. (115 Nm)
torque.
It is important to follow the ‘cross sequence’ pattern when install-
ing lug nuts. This will assure even seating of the wheel against
the hub.
With the valve stem to the outside, mount the wheel onto
the hub with lug nuts. Be sure to position the wheel on
hub correctly with arrow indicating direction of rotation
when moving forward. Finger tighten lug nuts in a 'cross
sequence' pattern (Ref Fig. 1 on page Q-2). Then, tighten
lug nuts to 50 - 85 ft. Ibs. (70 - 115 Nm) torque in 20 ft.
Ibs. (30 Nm) increments following the same 'cross
sequence' pattern.
NOTICE
ITEM NO
TORQUE SPECIFICATION
1
50 - 85 ft. lbs. (70 - 115 Nm)
Fig. 1 Wheel and Tires
Tire style may vary
1
2
3
4
'CROSS SEQUENCE'
Valve stem is always
to outside of wheel
Always replace dust cap
Rota
tio
n
Front of Vehicle
Summary of Contents for 625619 2012
Page 6: ...Page iv Repair and Service Manual NOTES TABLE OF CONTENTS ...
Page 181: ......