8.4 Running-in instructions
8.4.1 General
The following maintenance work must be performed when running
in new machines or overhauled engines.
8.4.2 After 25 operating hours
1.
Change the engine oil
Chapter 8.8.1 ‘Changing engine oil
and oil filter element’ on page 93
.
2.
Check engine and machine for leaks.
3.
Retighten the fastening screws on air filter, exhaust and other
attachments.
4.
Retighten the bolted connections on the machine.
Maintenance – Running-in instructions
DTR75D
87
Summary of Contents for DTR75D
Page 6: ...10 Disposal 119 10 1 Final shut down of machine 120 Table of contents DTR75D 6 ...
Page 7: ...1 Introduction Introduction DTR75D 7 ...
Page 11: ...2 Technical data Technical data DTR75D 11 ...
Page 15: ...3 Concerning your safety Concerning your safety DTR75D 15 ...
Page 42: ...Concerning your safety Signage DTR75D 42 ...
Page 43: ...4 Indicators and control elements Indicators and control elements DTR75D 43 ...
Page 50: ...Indicators and control elements Engine DTR75D 50 ...
Page 51: ...5 Checks prior to start up Checks prior to start up DTR75D 51 ...
Page 61: ...6 Operation Operation DTR75D 61 ...
Page 75: ...7 Loading transporting the machine Loading transporting the machine DTR75D 75 ...
Page 80: ...Loading transporting the machine After transportation DTR75D 80 ...
Page 81: ...8 Maintenance Maintenance DTR75D 81 ...
Page 109: ...9 Troubleshooting Troubleshooting DTR75D 109 ...
Page 118: ...Troubleshooting Engine malfunctions DTR75D 118 ...
Page 119: ...10 Disposal Disposal DTR75D 119 ...
Page 121: ......
Page 122: ......