Maintenance - Maintenance schedule
ICC1200C-1EN3.pdf
2012-05-16
Every 1000 hours of operation (Every six
months)
See Contents to find the page number of the sections
referred to!
Pos.
in fig
Action
Comment
Pos.
in fig
Action
Comment
13
Change the hydraulic fluid filter
13
Change the hydraulic fluid filter
12
Drain condensate from hydraulic tank
12
Drain condensate from hydraulic tank
6
Change the engine's fuel filter
6
Change the engine's fuel filter
6
Change the engine's pre-filter
6
Change the engine's pre-filter
6
Check the engine's toothed belt
Refer to the engine manual
6
Check the engine's toothed belt
Refer to the engine manual
6
Check engine's valve clearances
Refer to the engine manual
6
Check engine's valve clearances
Refer to the engine manual
Every 2000 hours of operation (Yearly)
See Contents to find the page numbers of the sections
referred to!
Pos.
in fig
Action
Comment
Pos.
in fig
Action
Comment
12
Change the hydraulic fluid
12
Change the hydraulic fluid
18
Change the oil in the drum
18
Change the oil in the drum
7
Drain and clean the water tank
7
Drain and clean the water tank
23
Drain and clean the emulsions tank
23
Drain and clean the emulsions tank
1
Drain and clean the fuel tank
1
Drain and clean the fuel tank
Check the condition of the articulation
Check the condition of the articulation
66
Summary of Contents for 10000333x0A000001
Page 2: ......
Page 12: ...Introduction ICC1200C 1EN3 pdf 2012 05 16 4 ...
Page 20: ...Special instructions ICC1200C 1EN3 pdf 2012 05 16 12 ...
Page 28: ...Technical specifications ICC1200C 1EN3 pdf 2012 05 16 20 ...
Page 31: ...Machine description ICC1200C 1EN3 pdf 2012 05 16 23 ...
Page 35: ...Machine description ICC1200C 1EN3 pdf 2012 05 16 27 ...
Page 42: ...Machine description ICC1200C 1EN3 pdf 2012 05 16 34 ...
Page 54: ...Operation ICC1200C 1EN3 pdf 2012 05 16 46 ...
Page 64: ...Operating instructions Summary ICC1200C 1EN3 pdf 2012 05 16 56 ...
Page 66: ...Operating instructions Summary ICC1200C 1EN3 pdf 2012 05 16 58 ...
Page 68: ...Preventive maintenance ICC1200C 1EN3 pdf 2012 05 16 60 ...
Page 90: ...Maintenance 250h ICC1200C 1EN3 pdf 2012 05 16 82 ...
Page 94: ...Maintenance 500h ICC1200C 1EN3 pdf 2012 05 16 86 ...
Page 104: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...
Page 105: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...