Miscellaneous
ICC1200C-1EN3.pdf
2012-05-16
Roller prepared for transport
Fig. Arrangement
1. Chocks
2. Wooden blocks
3. Lashing straps
3
3
1
2
1
Lock the articulation before lifting and
transporting. Follow the instructions under the
relevant heading.
Lock the articulation before lifting and
transporting. Follow the instructions under the
relevant heading.
Activate the parking brake.
Make sure that the machine is in a neutral position, i.e.
that the drums are in line.
Chock the drum and rubber wheels and secure the
chocks (1) to the transport vehicle. The drum and
rubber wheels should be chocked both forwards and
backwards.
Block up under the drum frame (2), to avoid
overloading the rubber suspension when lashing.
Block up the machine as shown in figure.
Secure down the roller with lashing straps (3) at all
four corners. The attachment points are shown on the
decals. Place the chains in symmetrical pairs crossing
each other.
Make sure that the chains, blocks and
attachments in the transport vehicle are approved
and have the requisite breaking strain. Check at
regular intervals that the chains are not slack.
Make sure that the chains, blocks and
attachments in the transport vehicle are approved
and have the requisite breaking strain. Check at
regular intervals that the chains are not slack.
Remember to reset the steering joint lock to its
open position before starting the roller again.
Remember to reset the steering joint lock to its
open position before starting the roller again.
55
Summary of Contents for 10000333x0A000001
Page 2: ......
Page 12: ...Introduction ICC1200C 1EN3 pdf 2012 05 16 4 ...
Page 20: ...Special instructions ICC1200C 1EN3 pdf 2012 05 16 12 ...
Page 28: ...Technical specifications ICC1200C 1EN3 pdf 2012 05 16 20 ...
Page 31: ...Machine description ICC1200C 1EN3 pdf 2012 05 16 23 ...
Page 35: ...Machine description ICC1200C 1EN3 pdf 2012 05 16 27 ...
Page 42: ...Machine description ICC1200C 1EN3 pdf 2012 05 16 34 ...
Page 54: ...Operation ICC1200C 1EN3 pdf 2012 05 16 46 ...
Page 64: ...Operating instructions Summary ICC1200C 1EN3 pdf 2012 05 16 56 ...
Page 66: ...Operating instructions Summary ICC1200C 1EN3 pdf 2012 05 16 58 ...
Page 68: ...Preventive maintenance ICC1200C 1EN3 pdf 2012 05 16 60 ...
Page 90: ...Maintenance 250h ICC1200C 1EN3 pdf 2012 05 16 82 ...
Page 94: ...Maintenance 500h ICC1200C 1EN3 pdf 2012 05 16 86 ...
Page 104: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...
Page 105: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...