Miscellaneous
ICC1200C-1EN3.pdf
2012-05-16
Towing/Recovering
The roller can be moved up to 300 meters (1,000 ft)
using the instructions below.
Release the brakes
1
2
3
Fig. Left side of drum
1. Brake tool
2. Fastening screw
3. Disengagement nut
Activate the parking brake, and stop the engine.
Block the drum with a chock to prevent movement;
the roller can start rolling when the brakes are
released.
Activate the parking brake, and stop the engine.
Block the drum with a chock to prevent movement;
the roller can start rolling when the brakes are
released.
The disc brake in each drive motor must be
disengaged mechanically, according to below
following instructions, before the roller can be
towed.
The disc brake in each drive motor must be
disengaged mechanically, according to below
following instructions, before the roller can be
towed.
4
Fig. Brake housing
4. Center plug
Remove the center plug (4) using a screwdriver.
Screw off the brake tool (1) from its threaded fixing
hole. Then fix the brake tool (1) in the center hole by
tightening the screw (2) until it bottoms in the hole.
Tighten the nut (3) against the brake tool until it stops,
indicating that the brakes is now disengaged.
Disengaging the brakes
Screw out the nut again after towing. This returns the
brakes to their normal mode. Screw off the brake tool
and fit it back into its fixing holes. Refit the center plug
(4) to counteract the information of rust inside the
threaded hole.
51
Summary of Contents for 10000333x0A000001
Page 2: ......
Page 12: ...Introduction ICC1200C 1EN3 pdf 2012 05 16 4 ...
Page 20: ...Special instructions ICC1200C 1EN3 pdf 2012 05 16 12 ...
Page 28: ...Technical specifications ICC1200C 1EN3 pdf 2012 05 16 20 ...
Page 31: ...Machine description ICC1200C 1EN3 pdf 2012 05 16 23 ...
Page 35: ...Machine description ICC1200C 1EN3 pdf 2012 05 16 27 ...
Page 42: ...Machine description ICC1200C 1EN3 pdf 2012 05 16 34 ...
Page 54: ...Operation ICC1200C 1EN3 pdf 2012 05 16 46 ...
Page 64: ...Operating instructions Summary ICC1200C 1EN3 pdf 2012 05 16 56 ...
Page 66: ...Operating instructions Summary ICC1200C 1EN3 pdf 2012 05 16 58 ...
Page 68: ...Preventive maintenance ICC1200C 1EN3 pdf 2012 05 16 60 ...
Page 90: ...Maintenance 250h ICC1200C 1EN3 pdf 2012 05 16 82 ...
Page 94: ...Maintenance 500h ICC1200C 1EN3 pdf 2012 05 16 86 ...
Page 104: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...
Page 105: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...