04
05
W
W
W
.
D
Y
E
P
A
I
N
T
B
A
L
L
.
C
O
M
W
W
W
.
D
Y
E
P
A
I
N
T
B
A
L
L
.
C
O
M
QUICK START UP GUIDE
Before playing with your new RIZE ™
paintball marker there are a few
important steps to take.
STEP 1. BATTERY INSTALLATION
A . Remove three rig ht hand sid e g rip p anel screws with a 3/ 32” allen key.
B. Open grip panel and install 9V battery into the connector inside the frame. Start
by inserting the top of the battery into the recess and aligning the battery terminals
with the contacts on the board, then pushing the bottom of the battery fully into
place. Ensure that the battery removal ribbon leaves a small tail accessible from
under battery when installed to aid for easy battery removal. Note the markings
above the battery housing which indicate which of the board contacts are positive
and negative and install the battery accordingly.
C. Close g rip p anel and tig hten the three screws b ack. W hile closing the p anel
ob serve that no wires g et caug ht b etween the frame and the g rip p anel.
STEP 2. BARREL INSTALLATION
A . Screw on the b arrel to the front of the RIZE ™. Make sure it thread s all the
way in and is secure.
B. A ttach the b arrel p lug so that it covers the tip of the b arrel and secure
the g un.
STEP 4 . ATTACHING GAS SOURCE
Screw on a p reset air system into the airp ort located on the b ottom of the g rip frame.
Be sure the air system is screwed in all the way into the A irp ort. If there is a leak
from the airp ort when screwing in the air system, rep lace the o- ring on the p reset reg ulator.
STEP 5. TURNING ON THE RAIL™ AND CHECKING THE VELOCITY
A . Make sure you and everyb od y around you is wearing A ST M / CE ap p roved
p aintb all masks.
B. Press and hold the top b utton located b ehind the g rip frame until the RA IL™
turns on.
WARNING, THE RAIL™ IS LIVE. MAKE SURE BARREL PLUG IS IN PLACE
AND DO
NOT POINT THE RAIL™ AT ANYTHING YOU DON’T INTEND TO SHOOT.
C. Fill up the loader with .68 caliber paintballs.
D. Shoot the RA IL™ over a chronograph to check the velocity. If adjustment is
needed, adjust the velocity by turning the Hyper3™ velocity adjustment screw with
a 3/ 16” allen key. In ( clockwise) will reduce the velocity and out ( counter clockwise)
will increase the velocity. After each adjustment it takes a few shots before the
change can be seen on the chronograph. Never adjust the RA IL™ to shoot faster
than 30 0 fps or what the field rules / local laws permit.
Q UI C K R E F E R E NC E
USI NG YO UR MA R K E R
Q UI C K R E F E R E NC E
USI NG YO UR MA R K E R
STEP 3. LOADER INSTALLATION
W hen screwing the air system into the airp ort, always check that the thread s on
the air system and the airp ort are clean and not worn out. If you think the thread s
are not in g ood cond ition, contact DY E Precision or a p rofessional store b efore
screwing in the air system.
The RIZE ™ airp ort will work with b oth 30 0 0 p si, 4 50 0 p si air systems and CO
2
tanks fitted with an anti - sip hon.
With the clamp lever lifted away from the feed neck press your hopper into the feed
neck collar. Then lower the lever down to secure the loader. If the collar’s grip needs
to be adjusted turn the upper screw with a 3/32” hex tool. If the grip is too tight turn
the screw counter- clockwise. If the grip is not tight enough turn the screw clockwise. For
best results use a force feeding motorized loader, preferably a DYE Rotor Loader.