Operation
44
Operating Instructions 755 B, 756 B/F - 00.0 - 02/2021
4.16.3 Setting up single pipe
Fig. 33: Setting up single pipe
To set up single pipe:
1. You switch and set the transport clamps from double pipe to single pipe
(also requires a change of the folder tools!) at the OP7000 control
panel.
Program parameters > Process of transport
clamp > Transport clamp quick adjustment
2. Position the piping strip at the front or rear stop (3).
3. Position the piping strip at the center stop (4).
4. Start sewing.
(3)
- Stops
(4)
- Center stop
④
③
Summary of Contents for 755 B
Page 1: ...755 B 756 B F Operating Instructions...
Page 6: ...Table of Contents 4 Operating Instructions 755 B 756 B F 00 0 02 2021...
Page 10: ...About these instructions 8 Operating Instructions 755 B 756 B F 00 0 02 2021...
Page 18: ...Machine description 16 Operating Instructions 755 B 756 B F 00 0 02 2021...
Page 292: ...Programming 290 Operating Instructions 755 B 756 B F 00 0 02 2021...
Page 306: ...Maintenance 304 Operating Instructions 755 B 756 B F 00 0 02 2021...
Page 328: ...Setup 326 Operating Instructions 755 B 756 B F 00 0 02 2021...
Page 330: ...Decommissioning 328 Operating Instructions 755 B 756 B F 00 0 02 2021...
Page 332: ...Disposal 330 Operating Instructions 755 B 756 B F 00 0 02 2021...
Page 354: ...Technical data 352 Operating Instructions 755 B 756 B F 00 0 02 2021...
Page 373: ......