![DURAVANT QC CONVEYORS PF52 Maintenance Manual Download Page 22](http://html1.mh-extra.com/html/duravant/qc-conveyors-pf52/qc-conveyors-pf52_maintenance-manual_2541747022.webp)
22
PF Conveyors | Installation, Operation & Maintenance Manual
u
Finalizing Maintenance
/ Završno održavanje
The following steps must be completed after performing any of the maintenance procedures described in the “Maintenance” section on pages 16 - 21.
T Ovi koraci moraju biti dovršeni nakon izvođenja bilo kojeg od postupaka održavanja opisanih u odjeljku Održavanje.
EN
1
Center the belt on the tail and
rotate it down into the operat-
ing position.
2
Insert both pins into the tail.
3
Slide the conveyor into the
table.
4
Replace the clear plastic
guards by sliding over the
twist nuts at the corresponding
numbers on the conveyor. Turn the
nuts to the horizontal position to
lock in place.
CR Centrirajte remen na rep i zarotirajte
prema dolje u radni položaj
Umetnite obje igle u rep
Gurnite transportnu traku u stol
Zamijenite štitnike klizeći preko
zavrtnih matica na odgovarajućim
brojčanim pozicijama i uvijanjem
matica u vodoravni položaj da se
zaključaju na mjestu
EN
5
Reconnect the conveyor to
the control panel.
ES Ponovno spojite transportnu traku na
upravljačku ploču
After the “Finalizing Maintenance” steps are completed and power is restored, all of the control LEDs should be lit and green. If the LEDs are not lit and green, refer to the
“Control LEDs” portion of the “Troubleshooting” section of this manual on page 24.
Nakon dovršetka koraka održavanja i vraćanja napajanja, sve LED diode upravljača trebaju biti upaljene i zelene. Ako LED diode nisu upaljene i zelene, pogledajte odjeljke
LED diode upravljača i Rješavanje problema u ovom priručniku.