![Dunkirk Q90-100 Installation, Operation & Maintenance Manual Download Page 7](http://html1.mh-extra.com/html/dunkirk/q90-100/q90-100_installation-operation-and-maintenance-manual_2539852007.webp)
7
Table 3 - 90 - 50/75 SERIES 2 PROPANE GAS
MODEL 90-50
Stock Factory
Btu Value of Propane Gas++
Settings
2300
2350
2400
2450
2500
Altitude in Ft.
0-5,000
5,000-10,000
Normal Input (MBH)
50
–
–
–
–
–
Manifold Pressure In W.C.
2.5
3
3
2.5
2.5
2.5
Orifi ce
43331095
43331095
MODEL 90-75*
Stock Factory
Btu Value of Propane Gas++
Settings
2300
2350
2400
2450
2500
Altitude in Ft.
0-5,000
5,000-10,000
Normal Input (MBH)
75
–
–
–
–
–
Manifold Pressure In W.C.
2.5
3.5
3.5
3.5
3
3
Orifi ce
43331093
43331096*
* For model 90-75 Propane units only at altitudes above 5,000 ft., install 90-75 High Altitude Orifi ce Kit #550002629 For all other
altitudes use sea level orifi ce.
++Contact local gas utility or distributor for Btu value of gas.
BOILERS FOR USE AT HIGH ALTITUDE - UNITED STATES INSTALLATIONS
Model 90-75 propane (LP) units only at altitudes
above 5,000 ft., install 90-75 High Altitude Ori
fi
ce Kit
#550002629*.
For all other altitudes use sea level ori
fi
ce
Summary of Contents for Q90-100
Page 2: ...2 DIMENSIONS 2 Figure 1 Boiler Dimensions...
Page 12: ...12 NEAR BOILER PIPING Figure 2 Single Zone Boiler Piping...
Page 14: ...14 Figure 4 Two Zone Boiler Piping With Circulators NEAR BOILER PIPING...
Page 19: ...19 Figure 9 Diaphragm Type Expansion Tank Piping NEAR BOILER PIPING...
Page 20: ...20 Figure 10 Conventional Closed Type Expansion Tank Piping NEAR BOILER PIPING...
Page 24: ...24 Figure 12 Roof Vent Intake Terminations COMBUSTION AIR AND VENT PIPE VENT AIR INTAKE...
Page 32: ...32 Figure 21 Ladder Wiring Diagram ELECTRICAL WIRING...
Page 34: ...34 Figure 23 Ladder Diagram for Figure 22 ELECTRICAL WIRING...
Page 40: ...40 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Table 9 State Code Definitions...
Page 41: ...41 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Figure 26 Sequence of Operation...
Page 48: ...48 TROUBLESHOOTING Table 10 Error Codes...
Page 55: ...NOTES...
Page 56: ...DUNKIRK BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...