![Dunkirk Q90-100 Installation, Operation & Maintenance Manual Download Page 54](http://html1.mh-extra.com/html/dunkirk/q90-100/q90-100_installation-operation-and-maintenance-manual_2539852054.webp)
54
Compatible Aluminum Antifreeze & Inhibitor Suppliers
Noburst AL Antifreeze
Noble Company
P. O. Box 350
Grand Haven, MI 49417
www.noblecompany.com
Tel: 800-878-5788
Fax: 231-799-8850
Rhogard Antifreeze &
Pro-Tek 922 Inhibitor*
Rhomar Water Management, Inc.
P. O. Box 229
Spring
fi
eld, MO 65801
www.rhomarwater.com
Tel: 800-543-5975
Fax: 417-862-6410
* Pro-Tek 922 Inhibitor may be used to adjust the pH level of the hydronic system, but on occasion may not resolve the
pH issue. In these cases,
fl
ush the system and re
fi
ll with untreated water and antifreeze suitable for aluminum heat
exchangers, as listed in this supplement.
Alphi-11
Hydronic Agencies, Ltd.
(Fernox North Distributor)
15363 117 Avenue
Edmonton, AB T5M 3X4
Canada
www.hydronicagencies.com
Tel: 780-452-8661
Fax: 780-488-2304
Fernox
www.fernox.com
Intercool NFP-30,40,50 AA
Intercool RPH-15*
Interstate Chemical
2797 Freedland Road
P.O. Box 1600
Hermitage, PA 16148-0600
www.interstatechemical.com
Tel: 800-422-2436
Fax: 724-981-8383
Hercules cryo-tek™-100/Al
Hercules Chemical Company, Inc.
111 South Street
Passaic, NJ 07055
www.herchem.com
Tel: 800-221-9330
Fax: 800-333-3456
* This product may be used to adjust pH level of hydronic system, but on occasion may not resolve pH issue. In these
cases it is recommended to
fl
ush system and re
fi
ll with untreated water and new boiler manufacturer approved
antifreeze suitable for Aluminum heat exchangers.
Table 11 - Antifreeze Products
System and Operating Precautions
Applies to ALL Aluminum High Effi ciency Gas-Fired Water Boilers
Summary of Contents for Q90-100
Page 2: ...2 DIMENSIONS 2 Figure 1 Boiler Dimensions...
Page 12: ...12 NEAR BOILER PIPING Figure 2 Single Zone Boiler Piping...
Page 14: ...14 Figure 4 Two Zone Boiler Piping With Circulators NEAR BOILER PIPING...
Page 19: ...19 Figure 9 Diaphragm Type Expansion Tank Piping NEAR BOILER PIPING...
Page 20: ...20 Figure 10 Conventional Closed Type Expansion Tank Piping NEAR BOILER PIPING...
Page 24: ...24 Figure 12 Roof Vent Intake Terminations COMBUSTION AIR AND VENT PIPE VENT AIR INTAKE...
Page 32: ...32 Figure 21 Ladder Wiring Diagram ELECTRICAL WIRING...
Page 34: ...34 Figure 23 Ladder Diagram for Figure 22 ELECTRICAL WIRING...
Page 40: ...40 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Table 9 State Code Definitions...
Page 41: ...41 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Figure 26 Sequence of Operation...
Page 48: ...48 TROUBLESHOOTING Table 10 Error Codes...
Page 55: ...NOTES...
Page 56: ...DUNKIRK BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...