
3
INTRODUCTION
Introduction
• This appliance is a gas-
fi
red direct vent hot water boiler
with cast aluminum boiler sections.
• The heating system water absorbs large amounts of
heat from the cast aluminum heat exchanger, cooling
fl
ue gases and causing condensation.
• Sealed combustion, premix gas burner, and low
fl
ame
temperature means reduced CO and NOx emissions,
which contribute to cleaner and healthier environment.
• This appliance takes its combustion air directly from
outdoors (sealed combustion) and does not compete
with building occupants for fresh air.
• Sealed combustion (also known as “direct vent”)
is safest and best way to obtain plenty of clean
combustion air.
Dimensions ....................................................................................................................2
Introduction ...................................................................................................................3
Important Safety Information ...........................................................................................4
Boiler Ratings & Capacities ..............................................................................................5
Boilers For Use At High Altitude .......................................................................................5
Before Installing The Boiler ..............................................................................................8
Boiler Installation ...........................................................................................................9
Near Boiler Piping ......................................................................................................... 11
Combustion Air And Vent Pipe ........................................................................................ 22
Gas Supply Piping ......................................................................................................... 28
Electrical Wiring ........................................................................................................... 30
Controls And Accessories ............................................................................................... 35
Start Up ...................................................................................................................... 37
Operating Instructions ................................................................................................... 38
S9381a Integrated Boiler Control Operation And Adjustments ............................................. 39
Maintenance And Cleaning ............................................................................................. 45
Troubleshooting ............................................................................................................ 47
Differential Air Pressure Switch Check ............................................................................. 49
Installation And Check-Out Certi
fi
cate ............................................................................. 50
Appendix A - Water Quality, Water Treatment And Freeze Protection .................................... 51
• Induced draft fan draws in outside combustion air,
takes cooler
fl
ue gases from boiler unit and provides
positive removal of
fl
ue gases from the building
through readily available PVC and CPVC pipes.
• These low pressure gas-
fi
red hot water boilers are
design certi
fi
ed by CSA International for use with
natural gas and propane gases (90-100 model is
certi
fi
ed for natural gas only).
• Boilers are constructed and hydrostatically tested
for maximum working pressure of 50 psig (pounds
per square inch gage) in accordance with A.S.M.E.
(American Society of Mechanical Engineers) Boiler and
Pressure Vessel Code Section IV Standards for heating
boilers.
Summary of Contents for Q90-100
Page 2: ...2 DIMENSIONS 2 Figure 1 Boiler Dimensions...
Page 12: ...12 NEAR BOILER PIPING Figure 2 Single Zone Boiler Piping...
Page 14: ...14 Figure 4 Two Zone Boiler Piping With Circulators NEAR BOILER PIPING...
Page 19: ...19 Figure 9 Diaphragm Type Expansion Tank Piping NEAR BOILER PIPING...
Page 20: ...20 Figure 10 Conventional Closed Type Expansion Tank Piping NEAR BOILER PIPING...
Page 24: ...24 Figure 12 Roof Vent Intake Terminations COMBUSTION AIR AND VENT PIPE VENT AIR INTAKE...
Page 32: ...32 Figure 21 Ladder Wiring Diagram ELECTRICAL WIRING...
Page 34: ...34 Figure 23 Ladder Diagram for Figure 22 ELECTRICAL WIRING...
Page 40: ...40 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Table 9 State Code Definitions...
Page 41: ...41 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Figure 26 Sequence of Operation...
Page 48: ...48 TROUBLESHOOTING Table 10 Error Codes...
Page 55: ...NOTES...
Page 56: ...DUNKIRK BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...