
26
Figure 15 - Concentric Vent Terminations
Combustion
Air
Vent
1" (2.54cm)
Maximum
Maintain 12"
clearance above
highest anticipated
snow level or grade
* See Note
Below
Vent
Combustion
Air
36"(0.9m) Minimum
Maintain 12"(30cm)
clearance above highest
anticipated snow level or
grade
12" (30cm) Minimum
*Must be less than 4" or greater than 24" Horizontal dis-
tance between end bells of each air intake to prevent
fl
ue
gas recirculation.
1" (2.54cm)
Maximum
Overhang
VENT
COMBUSTION AIR
COMBUSTION
AIR
1” MAXIMUM
NOTE:
SECURING STRAP MUST BE FIELD INSTALLED TO
PREVENT MOVEMENT OF TERMINATION KIT IN SIDE
WALL.
ELBOW
(FIELD SUPPLIED)
A
A
B
B
C
C
STRAP
(FIELD SUPPLIED)
VENT
Figure 16 - Concentric Vent
COMBUSTION AIR AND VENT PIPE
Figure 17 - Concentric Vent Roof
Installation
VENT
VENT
A
A
B
B
C
C
D
D
COM
AIR
COMBUSTION AIR
ROOF BOOT/FLASHING
(FIELD SUPPLIED)
ELBOW
(FIELD SUPPLIED)
SUPPORT
(FIELD SUPPLIED)
MAINTANIN 12 IN.
(18IN. FOR CANADA)
MINIMUM CLEARANCE
ABOVE HIGHEST
ANTICIPATED SNOW
LEVEL. MAXIMUM OF
24 IN. ABOVE ROOF
NOTE:
SUPPORT MUST BE
FIELD INSTALLED TO
SECURE TERMINATION
KIT TO STRUCTURE.
Summary of Contents for Q90-100
Page 2: ...2 DIMENSIONS 2 Figure 1 Boiler Dimensions...
Page 12: ...12 NEAR BOILER PIPING Figure 2 Single Zone Boiler Piping...
Page 14: ...14 Figure 4 Two Zone Boiler Piping With Circulators NEAR BOILER PIPING...
Page 19: ...19 Figure 9 Diaphragm Type Expansion Tank Piping NEAR BOILER PIPING...
Page 20: ...20 Figure 10 Conventional Closed Type Expansion Tank Piping NEAR BOILER PIPING...
Page 24: ...24 Figure 12 Roof Vent Intake Terminations COMBUSTION AIR AND VENT PIPE VENT AIR INTAKE...
Page 32: ...32 Figure 21 Ladder Wiring Diagram ELECTRICAL WIRING...
Page 34: ...34 Figure 23 Ladder Diagram for Figure 22 ELECTRICAL WIRING...
Page 40: ...40 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Table 9 State Code Definitions...
Page 41: ...41 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Figure 26 Sequence of Operation...
Page 48: ...48 TROUBLESHOOTING Table 10 Error Codes...
Page 55: ...NOTES...
Page 56: ...DUNKIRK BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...