Stage 2 Starting
low, pressure switch (9PS-2) begins timing. If suction
Subsequent to the start of Compressor No. 1 an
pressure does not rise above setpoint within 120
approximate five minute time delay is incorporated
seconds, the compressor will be shut down.
into the microprocessor. After this time delay, and a
further call for cooling, the second step of the staging
Timer (7TR-2) will energize the fast unload solenoid
thermostat (4TAS) will close. This will energize relay
(6SOL) for 30 seconds then energize relay (3CR).
(9CR). If all the safety controls and switches are
closed, (see "Safety Control" section for more details)
Upon energizing relay (3CR), the NO contacts are
the control circuit for Compressor No. 2 will energize,
closed, allowing the thermostat (4TAS) to energize the
allowing the compressor start and energizing switches
load solenoid (4SOL) and the unload solenoid (8SOL)
(1M1-1 and 2M1-2) open the oil heater and activate
upon demand.
the fan control circuit. If suction pressure is
SHUTDOWN SEQUENCE
Stage 2 Shutdown
Stage 1 Shutdown
After both compressors have unloaded fully and the
If the leaving water temperature is still lower than the
leaving water temperature is still lower than the
setpoint, the first step of the thermostat (4TAS) will
setpoint, the second step of the thermostat (4TAS) will
open and de-energize relay (8CR). This will close the
open and de-energize relay (9CR) providing an
liquid line solenoid (1SOL) and turn off Compressor
approximate three minute time delay integral with the
No. 1 as long as it has run for approximately three
microprocessor, has expired subsequent to the start
minutes. Compressor No. 1 will not be able to restart
of Compressor No. 2. This will close the liquid line
for five minutes.
solenoid (5SOL) and turn off Compressor No. 2.
Compressor No. 1 will load and unload as required.
Compressor No. 2 will not be able to restart for five
minutes due to integral time delays.
SAFETY CONTROLS
The unit is protected by the following safety controls:
8.
Water Flow Switch (FLS)
1.
High Pressure (1PS)
9.
Fan Circuit Breakers (CB)
2.
Low Pressure (9PS)
10. Compressor Circuit Breakers (CB) (200/230V
3.
High Discharge/Oil Temperature (12TAS)
only)
4.
Compressor Solid State Module (1TAS)
5.
Low Water Temperature/Freeze (2TAS)
If any of these devices should open due to abnormal
6.
Compressor Starter Overloads (MOL) (200/230V
conditions, the compressor(s) will automatically stop.
only)
All controls must be manually reset, except the Under
7.
Under Voltage Relay (UVR)
Voltage Relay (UVR).
ELECTRICAL CONTROLS
Refer to pages 27 & 28 for A generation wiring
FLS
- Flow Switch. For ACDX/AUDX units, a
diagram.
chilled water flow switch must be installed
The following electrical controls that are used on A
while the package is in operation. Wire the
generation only are marked (A Gen).
flow switch to the terminals shown on the
S1
- Power Switch (115V Control Circuit)
This switch energizes the control circuit and
CWP
- Chilled Water Pump Interlock.
must be left on (except for temporary
For ACDX/AUDX units, it is recommended
control circuit service work) to allow normal
that an interlock between the chilled water
on cycle operation. Compressor sump
pump and the package be provided to
heaters are connected before this switch
prevent the unit from operating with the
and are not affected by switch position.
chilled water pump off. Connect the
S2
- Compressor Switch. This switch
diagram.
S3
disconnects power from the corresponding
S4
compressor control circuit. This switch is S5
1PS
- High Pressure Safety Switch (Manual
also used to reset the motor temperature
(A Gen) Reset)
protector 1TAS).
This is a manual reset switch that stops the
13
at the job site to ensure chilled water flow
wiring diagram.
interlock to the terminals shown on the
compressor in the event of excessive
discharge pressure. This is possibly
caused by fan failure or coil blockage.
Summary of Contents for ACDX
Page 25: ...TYPICAL POWER WIRING ACDX120A...
Page 26: ...TYPICAL CONTROL WIRING ACDX120A...
Page 27: ...TYPICAL OPTIONS WIRING ACDX120A...
Page 28: ...TYPICAL CONTROL WIRING ACDX120B W MICRO...
Page 29: ...TYPICAL CONTROL WIRING ACDX120B W MICRO...
Page 30: ...TYPICAL OPTIONS WIRING ACDX120B W MICRO...
Page 33: ......
Page 34: ...ACDX AUDX CONDENSER CLEARANCE...
Page 35: ......
Page 36: ...ACDX LOAD POINTS...
Page 37: ...ACDX RUBBER IN SHEAR ISOLATOR...
Page 38: ...ACDX SPRING ISOLATOR...
Page 39: ...AUDX LOAD POINTS...
Page 40: ...AUDX RUBBER IN SHEAR ISOLATOR...
Page 41: ...AUDX SPRING ISOLATOR...