194
195
ENGLISH
L1315004 Installation guide for DucoBox Energy Premium (Revision J | 22.10.2021)
09
Air-side calibration
Calibrating the DucoBox Energy Premium can be split into various steps:
1� Pre-setting supply and exhaust vents
2� Calibrating flow rates
The system needs to be configured for it to work correctly.
This will ensure its operation is as quiet as possible and energy-efficient.
09.A
Pre-setting vents
The exhaust and supply vents are installed in a moisture-laden/stale air extraction or fresh air supply duct� In order to calibrate the
air supply and exhaust correctly, these vents must be set
depending on the situation
in accordance with the table below�
A maximum of 50 m³/h is recommended for
supply
vents in order to prevent excessive noise from being
generated. For this reason it is recommended that the flow be split between different vents for higher flow rates.
SITUATION 1
:
One vent per zone
SITUATION 2
:
Multiple vents per zone
with
equal flow rates
SITUATION 3
:
Multiple vents per zone with
different flow rates
Set
all vents to the fully
open position
, regardless of
the desired flow rate�
Set
all vents to the fully
open position
, regardless of
the desired flow rate� With
DucoVent Design vents, turn
the cone on the trim plate to
the fully open position�
Set the vents so they match the desired flow rate
in accordance
with the table
�
EXAMPLE:
Zone 1 Zone 2
EXAMPLE:
Zone 1
EXAMPLE:
Zone 1
+
DUCOVENT
DESIGN
DUCOVENT BASIC
AND OTHER VENTS
100%
open
50%
open
25%
open
When using DucoVent Design exhaust vents, always leave at least the outer ring in
place for acoustic effect.
Foam
3_IM Energy Premium.indb 194
3_IM Energy Premium.indb 194
22/10/2021 11:52:06
22/10/2021 11:52:06