188
189
ENGLISH
L1315004 Installation guide for DucoBox Energy Premium (Revision J | 22.10.2021)
Floor mounting
Iteration
Rev. Date
Name
Description
23-Aug-17
Status Date
Status
MONTAGE_MUUR
mm³
dm²/m
kg/m
mm
Handelsstraat 19 - 8630 VEURNE
tel. 0032-58/330033 - fax.0032-58/330044
email: info @ duco.eu www.duco.eu
This drawing is property of Vero Duco NV and can not be copied, neither shown to
third party/externally without written permission.
0.000
0.000
Drawing Number
Volume
Coat. Surf.
Weight
Outline
MONTAGE_MUUR
Format: A0
Production Number:
Mat.:
Draftsman: -
Tol.: -
Scale: 0.300
-
Date: 23-Aug-17
Standard trap
When using a standard trap connection, a
water seal
of at least 80 mm
must be provided�
It also requires
to be filled with water before start-up.
This is to
prevent an air leak from occurring, preventing drain
smells in the ventilation and to obtain a water seal�
Iteration
Rev. Date
Name
Description
23-Aug-17
Status Date
Status
MONTAGE_MUUR
mm³
dm²/m
kg/m
mm
Handelsstraat 19 - 8630 VEURNE
tel. 0032-58/330033 - fax.0032-58/330044
email: info @ duco.eu www.duco.eu
This drawing is property of Vero Duco NV and can not be copied, neither shown to
third party/externally without written permission.
0.000
0.000
Drawing Number
Volume
Coat. Surf.
Weight
Outline
MONTAGE_MUUR
Format: A0
Production Number:
Mat.:
Draftsman: -
Tol.: -
Scale: 0.300
-
Date: 23-Aug-17
0000-4376
DucoBox Energy Premium (flat) trap
(not included in the supply)
You should preferably use this Duco flat diaphragm
trap, since it saves space and is less prone to air
leaks� It can be fitted ‘dry’ and it has the advantage
that it cannot dry out in hot weather�
OR
Iteration
Rev. Date
Name
Description
23-Aug-17
Status Date
Status
MONTAGE_MUUR
mm³
dm²/m
kg/m
mm
Handelsstraat 19 - 8630 VEURNE
tel. 0032-58/330033 - fax.0032-58/330044
email: info @ duco.eu www.duco.eu
This drawing is property of Vero Duco NV and can not be copied, neither shown to
third party/externally without written permission.
0.000
0.000
Drawing Number
Volume
Coat. Surf.
Weight
Outline
MONTAGE_MUUR
Format: A0
Production Number:
Mat.:
Draftsman: -
Tol.: -
Scale: 0.300
-
Date: 23-Aug-17
Slide the cardboard packaging off
the unit�
1
Iteration
Rev. Date
Name
Description
22-Nov-17
Status Date
Status
MONTAGE_MUUR
mm³
dm²/m
kg/m
mm
Handelsstraat 19 - 8630 VEURNE
tel. 0032-58/330033 - fax.0032-58/330044
email: info @ duco.eu www.duco.eu
This drawing is property of Vero Duco NV and can not be copied, neither shown to
third party/externally without written permission.
0.000
0.000
Drawing Number
Volume
Coat. Surf.
Weight
Outline
MONTAGE_MUUR
Format: A0
Production Number:
Mat.:
Draftsman: -
Tol.: -
Scale: 0.300
-
Date: 22-Nov-17
Fit the optional mounting plinth
in accordance with the manual
supplied with it and ensure that it is
positioned on a solid,
flat surface
�
2
Iteration
Rev. Date
Name
Description
22-Nov-17
Status Date
Status
MONTAGE_MUUR
mm³
dm²/m
kg/m
mm
Handelsstraat 19 - 8630 VEURNE
tel. 0032-58/330033 - fax.0032-58/330044
email: info @ duco.eu www.duco.eu
This drawing is property of Vero Duco NV and can not be copied, neither shown to
third party/externally without written permission.
0.000
0.000
Drawing Number
Volume
Coat. Surf.
Weight
Outline
MONTAGE_MUUR
Format: A0
Production Number:
Mat.:
Draftsman: -
Tol.: -
Scale: 0.300
-
Date: 22-Nov-17
Place the DucoBox Energy
Premium on the mounting plinth
and check again to ensure it
is
level
� This will ensure that
condensate drains off properly�
3
06.C
Fitting condensate drain
The DucoBox Energy Premium must always be fitted with a condensate drain at the bottom� The unit is supplied with a standard
32 mm drain with a threaded end� There is an extra 32 mm diameter by 20 cm connecting pipe in the packaging� Condensate must
be drained
frost-free and with a slight fall
� The condensate hose must not have any sharp bends�
3_IM Energy Premium.indb 189
3_IM Energy Premium.indb 189
22/10/2021 11:52:04
22/10/2021 11:52:04