01. DRAW HORIZONTAL CENTERLINE ( )
02. POSITION TEMPLATE AS SHOWN AND
MARK VERTICAL CENTERLINE
5
Mark horizontal centerline on inside face of door 39-5/8"
from finished floor as shown. (Continue horizontal center
line to outside face of door if trim is used)
Mark vertical center line X-X above and below horizontal
center line. (Mark vertical center line at lock side using same
backset dimension on outside face of door if trim is using).
CAUTION:
Vertical center lines on both sides of the door
should be the same dimension from the edge
of the door. Use extra care if edge of door is
beveled. Be sure X-X vertical center line is
parallel to edge of door.
X
X
Hinge
Side
CL
39-5/8"
to Finished
Floor or
Threshold
CL
CL
RHR shown
(LHR opposite)
03. ALIGN TOP & BOTTOM TEMPLATES ALONG
CENTERLINE, THEN MARK AND PREPARE DOOR.
04. INSTALL TOP STRIKE AND SHIM.
E
CL
1. Fold strike template and
place on door stop and
inside face of door, so
the vertical centerline on
template lines up with the
vertical centerline on door
stop and door.
2. Tape template on door stop
and the door face.
3. Mark centers and drill/tap
holes as indicated on the
template. See "DOOR
PREPARATION CHART"
on page 4 for drill/tap, and
cut-out information.
Install a screw through each slot.
CL
CL
CL
Shim
DXAS106
Strike
Strike Screws
DXAS215 Strike
Strike Screws
Shim
DXAS108
Strike
Strike Screws
E