30
Sometime during the second revolu-
tion the mold heater resets the ther-
mostat. at this time, the mold heater
is de-energized. If the storage bin is
full, the shut-off arm will remain in a
raised position.
At the end of the first revolution
the timing cam opens the holding
switch. However, since the thermo-
stat is still closed a second revolu-
tion begins.
once again after a few degrees of
rotation the timing cam closes the
holding switch providing a circuit to
the motor that will assure completion
of this revolution. the mold heater
remains energized. the shut-off arm
will raise and lower again operating
its switch. the ice that was ejected
during the first revolution is dumped
into the storage bin.
Near the completion of the first rev-
olution, the timing cam closes the
water valve switch. However since
the thermostat is still closed the
mold heater circuit is energized.
current will not pass through
the water valve solenoid and its
switch. (electrical current follows
the path of least resistance.)
Summary of Contents for RM3962
Page 15: ...14 RM3762 RM3962...
Page 20: ...19 Typical Two Side Wall Vent Application Always Refer To Vent Instructions 3308666 xxx...
Page 23: ...22...
Page 28: ...27...
Page 29: ...28 ICE MAKER TYPICAL WIRING DIAGRAM...
Page 33: ...32...