Network Managed Optical Amplifier
User’s Manual Rev 1.3
OFA-CCS/CCD Series
June 2014
7
2
PREPARATION
2.1
Summary
In this chapter, the first steps of installation after unpacking are covered. The box
inventory, basic electrical and optical connections are presented.
2.2
Check the Contents
After unpacking you need to check the contents. The inventory should be as follows:
Table 1. The Inventory of Shelf Type EDFA
Item
Quantity
Remarks
EDFA Shelf
1
Including EDFA
Instructions manual
1 book
TEST REPORT
1 booklet
Inspect the outside of the EDFA.
WARNING
: Remember to take all proper grounding precautions.
2.3
How to Connect the Power Supply
Figure 1 shows the electrical connectors with the input power terminals on the front panel
of the Shelf Type EDFA.
The user must select the applicable power connections for their application and properly
connect to the input power terminal.
(DC) (AC)
(a)
1U Shelf
(DC) (AC)
(b)
2U Shelf
Figure 1. Electric Power Supply Connection