PR95 Operator’s Manual
Prepare - 35
Prepare Jobsite
CMW
Dig Launch and Burster Pits
Dimensions
Requirements
Exit Pit (1)
•
Must be in line with existing pipe.
•
Sloped back end aids new pipe entry.
Burster Pit (2)
•
Must be in line with existing pipe.
•
Must allow burster to be level with existing pipe.
Unit
Burster Pit
Exit Pit *
Length (A)
Width (B)
Length (C)
Width (D)
U.S. (metric)
U.S. (metric)
U.S. (metric)
U.S. (metric)
PR95
12’ (3.6 m)
5’ (1.5 m)
10’ (3 m)
3’ (1 m)
* Exit pit dimensions depend on pipe depth and product being installed.
Summary of Contents for PR95
Page 1: ...PR95 Operator s Manual 053 1102 Issue 1 0 CMW...
Page 19: ...Safety 18 PR95 Operator s Manual Emergency Procedures CMW...
Page 39: ...Prepare 38 PR95 Operator s Manual Check Supplies and Prepare Equipment CMW...
Page 51: ...Burst Pipe 50 PR95 Operator s Manual Pull Pipe CMW...
Page 57: ...Systems and Equipment 56 PR95 Operator s Manual Accessory Kit CMW...
Page 92: ......
Page 93: ......
Page 94: ...PR95 Operator s Manual Service Record 93 CMW Service Record Service Performed Date Hours...
Page 95: ...Service Record 94 PR95 Operator s Manual CMW Service Performed Date Hours...