Plan Burst Path
CMW
Plan Burst Path
Plan the burst path, from entry to end, before job begins. Locate the entire route of the pipe to be replaced
to ensure a straight path. Expose all crossing or parallel utilities within 18” (500 mm) of the pipe being
burst. Visually verify that bursting head does not damage utility.
Prepare Jobsite
Mark Burst Path
Mark your planned burst path with flags or paint.
Jobsite hazards could cause death or serious injury. Use
correct equipment and work methods. Use and maintain proper safety
equipment.
NOTICE:
•
Cutting high voltage cable can cause electrocution. Expose lines by hand before digging.
•
All vegetation near operator’s station must be removed. Contact with trees, shrubs, or weeds during
electrical strike could result in electrocution.
Summary of Contents for PR95
Page 1: ...PR95 Operator s Manual 053 1102 Issue 1 0 CMW...
Page 19: ...Safety 18 PR95 Operator s Manual Emergency Procedures CMW...
Page 39: ...Prepare 38 PR95 Operator s Manual Check Supplies and Prepare Equipment CMW...
Page 51: ...Burst Pipe 50 PR95 Operator s Manual Pull Pipe CMW...
Page 57: ...Systems and Equipment 56 PR95 Operator s Manual Accessory Kit CMW...
Page 92: ......
Page 93: ......
Page 94: ...PR95 Operator s Manual Service Record 93 CMW Service Record Service Performed Date Hours...
Page 95: ...Service Record 94 PR95 Operator s Manual CMW Service Performed Date Hours...