Prepare - 30
PR95 Operator’s Manual
Gather Information
CMW
Gather Information
A successful job begins before the burst. The first step in planning is reviewing information already
available about the job and jobsite.
Review Job Plan
Review blueprints or other plans and make sure you have taken enlargement during pullback into account.
Check for information about existing or planned structures, elevations, or proposed work that may be
taking place at the same time.
Notify One-Call Services
Call area One-Call or similar services and have existing lines located and marked. Call any utilities in your
area that do not subscribe to One-Call.
Examine Pullback Material
Ask for a sample of the material you will be pulling back. Check its weight and stiffness. Contact the
manufacturer for bend radius information. Check that you have appropriate pullback devices.
Arrange for Traffic Control
If working near a road or other traffic area, contact local authorities about safety procedures and
regulations.
Plan for Emergency Services
Have the telephone numbers for local emergency and medical facilities on hand. Check that you will have
access to a telephone.
Summary of Contents for PR95
Page 1: ...PR95 Operator s Manual 053 1102 Issue 1 0 CMW...
Page 19: ...Safety 18 PR95 Operator s Manual Emergency Procedures CMW...
Page 39: ...Prepare 38 PR95 Operator s Manual Check Supplies and Prepare Equipment CMW...
Page 51: ...Burst Pipe 50 PR95 Operator s Manual Pull Pipe CMW...
Page 57: ...Systems and Equipment 56 PR95 Operator s Manual Accessory Kit CMW...
Page 92: ......
Page 93: ......
Page 94: ...PR95 Operator s Manual Service Record 93 CMW Service Record Service Performed Date Hours...
Page 95: ...Service Record 94 PR95 Operator s Manual CMW Service Performed Date Hours...