Burst Pipe - 48
PR95 Operator’s Manual
Pull Pipe
CMW
Pull Pipe
1.
Push bursting unit away from pit wall slightly.
2.
Slide pulling brace (shown) into position.
Ensure brace is flush with pit wall.
3.
Put bursting unit into pull mode.
4.
Enable brake.
5.
Pull back rod.
6.
Unthread and place in rod box.
7.
Continue pulling back rods until towing
assembly reaches burster pit.
Summary of Contents for PR95
Page 1: ...PR95 Operator s Manual 053 1102 Issue 1 0 CMW...
Page 19: ...Safety 18 PR95 Operator s Manual Emergency Procedures CMW...
Page 39: ...Prepare 38 PR95 Operator s Manual Check Supplies and Prepare Equipment CMW...
Page 51: ...Burst Pipe 50 PR95 Operator s Manual Pull Pipe CMW...
Page 57: ...Systems and Equipment 56 PR95 Operator s Manual Accessory Kit CMW...
Page 92: ......
Page 93: ......
Page 94: ...PR95 Operator s Manual Service Record 93 CMW Service Record Service Performed Date Hours...
Page 95: ...Service Record 94 PR95 Operator s Manual CMW Service Performed Date Hours...