PR95 Operator’s Manual
Burst Pipe - 47
Connect
CMW
Connect
1.
Install towing head (2) onto end of new pipe
(1).
2.
Remove pilot rod assembly.
3.
Install bursting head (5) over rod (6) and slide
forward until threads are visible.
4.
Thread stop rod assembly (4) on end of rod
string.
5.
Connect stop rod assembly to towing head
with a shackle (3).
Summary of Contents for PR95
Page 1: ...PR95 Operator s Manual 053 1102 Issue 1 0 CMW...
Page 19: ...Safety 18 PR95 Operator s Manual Emergency Procedures CMW...
Page 39: ...Prepare 38 PR95 Operator s Manual Check Supplies and Prepare Equipment CMW...
Page 51: ...Burst Pipe 50 PR95 Operator s Manual Pull Pipe CMW...
Page 57: ...Systems and Equipment 56 PR95 Operator s Manual Accessory Kit CMW...
Page 92: ......
Page 93: ......
Page 94: ...PR95 Operator s Manual Service Record 93 CMW Service Record Service Performed Date Hours...
Page 95: ...Service Record 94 PR95 Operator s Manual CMW Service Performed Date Hours...