Burst Pipe - 46
PR95 Operator’s Manual
Push Rods
CMW
Push Rods
1.
Start power unit engine.
2.
Assemble pilot rod. See “Pilot Rods” on page 52.
3.
Disable brake.
4.
Thread 2-3 rods together.
5.
Put bursting unit into push mode and push rod string into existing pipe.
6.
Thread next rod onto rod string loosely.
7.
Swing rod makeup device into position and place collar onto end of rod.
8.
Thread onto pipe loosely.
9.
Turn rotation speed/direction control to right.
10. Press engage switch until rods thread together completely.
11. Move rod makeup device clear of rod.
12. Push rod into pipe.
13. Continue threading rods together and pushing into pipe until pilot assembly enters exit pit.
IMPORTANT:
If bursting unit or rod makeup device does not work,
•
Ensure all emergency stops are connected and disengaged.
•
Check all hydraulic and electrical connections.
IMPORTANT:
Spray lubricant (such as WD-40) on threads of each rod every use.
Summary of Contents for PR95
Page 1: ...PR95 Operator s Manual 053 1102 Issue 1 0 CMW...
Page 19: ...Safety 18 PR95 Operator s Manual Emergency Procedures CMW...
Page 39: ...Prepare 38 PR95 Operator s Manual Check Supplies and Prepare Equipment CMW...
Page 51: ...Burst Pipe 50 PR95 Operator s Manual Pull Pipe CMW...
Page 57: ...Systems and Equipment 56 PR95 Operator s Manual Accessory Kit CMW...
Page 92: ......
Page 93: ......
Page 94: ...PR95 Operator s Manual Service Record 93 CMW Service Record Service Performed Date Hours...
Page 95: ...Service Record 94 PR95 Operator s Manual CMW Service Performed Date Hours...