
Conduct a Bore - 78
JT5 Operator’s Manual
Record Bore Path
CMW
®
Drill Head Position
The drill head position is determined by reading
beacon roll. Roll is displayed as a clock face
position.
1.
Read beacon roll.
2.
Slowly rotate pipe until locator displays desired
beacon roll.
To change direction:
1.
Rotate pipe to clock position you intend to travel.
2.
Push pipe into ground.
To move forward without changing direction:
Rotate pipe into ground.
Record Bore Path
Locate drill head every length of pipe. As the job is completed, record the actual data for each drill pipe.
List pitch and depth of each joint and a brief description of the procedure. In addition, draw a simple sketch
of the site and record depth and rough location of pullback.
The Trac Management System Plus is also available for plotting and tracking your bore path. It utilizes the
tracker, display, a tracking beacon, and special software. The display can store jobs in its memory or the
system can be run in the field using a laptop computer equipped with the Windows
®
95 or higher operating
system. See your Ditch Witch
®
dealer for details.
Summary of Contents for JT5
Page 1: ...JT5 Issue 3 0 Original Instruction Operator s Manual CMW 053 2380...
Page 7: ...Overview 6 JT5 Operator s Manual CMW...
Page 21: ...Safety 20 JT5 Operator s Manual Machine Safety Alerts CMW...
Page 61: ...Drive 60 JT5 Operator s Manual Shut Down Unit CMW...
Page 85: ...Conduct a Bore 84 JT5 Operator s Manual Remove Pullback Device CMW...
Page 119: ...Complete the Job 118 JT5 Operator s Manual Stow Tools CMW...
Page 149: ...Specifications 148 JT5 Operator s Manual CMW...
Page 152: ......
Page 153: ......
Page 154: ...JT5 Operator s Manual Service Record 153 CMW Service Record Service Performed Date Hours...
Page 155: ...CMW Service Record 154 JT5 Operator s Manual Service Performed Date Hours...