
Systems and Equipment - 112
JT5 Operator’s Manual
Drill Pipe
CMW
®
Make Up and Break Out Joints Correctly
•
Make up and break out joints slowly.
Do not ram pipes together during makeup or force them apart
during breakout. Carefully time rotation with carriage travel speed, and always connect and disconnect
joints slowly and deliberately. This will help prevent thread crossing, galling, and shoulder swelling.
•
Torque joints fully.
Once the joint is connected and the shoulder faces are touching, torque them to
full machine torque. Improperly torqued joints will damage the shoulder faces and threads, and will
cause joints to leak or break while drilling or backreaming.
Do not Overwork the Pipe
Never exceed the bend radius for your pipe. See “Recommended Bend Limits” on page 50. Do not
oversteer.
NOTICE:
Bending pipe more sharply than recommended will damage pipe and cause failure.
Summary of Contents for JT5
Page 1: ...JT5 Issue 3 0 Original Instruction Operator s Manual CMW 053 2380...
Page 7: ...Overview 6 JT5 Operator s Manual CMW...
Page 21: ...Safety 20 JT5 Operator s Manual Machine Safety Alerts CMW...
Page 61: ...Drive 60 JT5 Operator s Manual Shut Down Unit CMW...
Page 85: ...Conduct a Bore 84 JT5 Operator s Manual Remove Pullback Device CMW...
Page 119: ...Complete the Job 118 JT5 Operator s Manual Stow Tools CMW...
Page 149: ...Specifications 148 JT5 Operator s Manual CMW...
Page 152: ......
Page 153: ......
Page 154: ...JT5 Operator s Manual Service Record 153 CMW Service Record Service Performed Date Hours...
Page 155: ...CMW Service Record 154 JT5 Operator s Manual Service Performed Date Hours...