
JT5 Operator’s Manual
Systems and Equipment - 111
Drill Pipe
CMW
®
Use Drill Pipe Correctly
Align the Joints
Always carefully align the male and female
ends of pipe before screwing them together.
Poor alignment can damage the threads and
destroy the usefulness of the joint.
Clamp Pipe Correctly
Clamp on pipe when joint is centered between
wrenches. Clamp only on the tool joint of the
drill pipe as shown. This portion of the drill pipe
is designed for clamping and is considerably
thicker and stronger than the rest of the pipe.
IMPORTANT:
The first pipe drilled must be
in a straight line with the unit. A misaligned
pipe can damage threads on each pipe that
is added.
NOTICE:
Clamping anywhere else on the
pipe will weaken the pipe. Pipe can later
break, even when operating under normal
loads.
Summary of Contents for JT5
Page 1: ...JT5 Issue 3 0 Original Instruction Operator s Manual CMW 053 2380...
Page 7: ...Overview 6 JT5 Operator s Manual CMW...
Page 21: ...Safety 20 JT5 Operator s Manual Machine Safety Alerts CMW...
Page 61: ...Drive 60 JT5 Operator s Manual Shut Down Unit CMW...
Page 85: ...Conduct a Bore 84 JT5 Operator s Manual Remove Pullback Device CMW...
Page 119: ...Complete the Job 118 JT5 Operator s Manual Stow Tools CMW...
Page 149: ...Specifications 148 JT5 Operator s Manual CMW...
Page 152: ......
Page 153: ......
Page 154: ...JT5 Operator s Manual Service Record 153 CMW Service Record Service Performed Date Hours...
Page 155: ...CMW Service Record 154 JT5 Operator s Manual Service Performed Date Hours...