
Systems and Equipment - 102
JT5 Operator’s Manual
Downhole Tools
CMW
®
Downhole Tools
Nozzles
Nozzles control fluid flow from the pipe to the bore. Select nozzles that will supply
at least
the amount of
fluid per minute needed for the flow and pressure you will be using. A nozzle that will supply more fluid per
minute is recommended. See your Ditch Witch
®
dealer for nozzle recommendations.
Bits
Selection
These charts are meant as a guideline only. No one bit works well in all conditions. See your Ditch Witch
dealer for soil conditions and bit recommendations for your area.
•
1 = best
•
2 = good
•
3 = fair
•
4 = not recommended
Bit
Sandy
Soil
Soft Soil
Medium
Soil
Hard
Soil
Rocky
Soil
Soft
Rock
Hard
Rock
Sand bit
1
2
4
4
4
4
4
Durabit
2
2
1
1
4
4
4
Tuff bit
2
1
1
1
2
3
4
Steep Taper Tuff bit
4
3
2
1
1
2
4
Barracuda bit
2
1
1
2
3
4
4
Steep Taper bit
4
3
2
1
1
2
4
Hard Surface bit
2
1
2
3
4
4
4
Glacier bit
4
4
4
3
1
2
4
Rhino bit
4
4
3
3
1
1
3
Jetting assembly
4
4
3
2
1
2
3
Rockmaster
4
4
3
2
1
1
1
Talon Rock bit
4
3
2
1
1
1
4
Summary of Contents for JT5
Page 1: ...JT5 Issue 3 0 Original Instruction Operator s Manual CMW 053 2380...
Page 7: ...Overview 6 JT5 Operator s Manual CMW...
Page 21: ...Safety 20 JT5 Operator s Manual Machine Safety Alerts CMW...
Page 61: ...Drive 60 JT5 Operator s Manual Shut Down Unit CMW...
Page 85: ...Conduct a Bore 84 JT5 Operator s Manual Remove Pullback Device CMW...
Page 119: ...Complete the Job 118 JT5 Operator s Manual Stow Tools CMW...
Page 149: ...Specifications 148 JT5 Operator s Manual CMW...
Page 152: ......
Page 153: ......
Page 154: ...JT5 Operator s Manual Service Record 153 CMW Service Record Service Performed Date Hours...
Page 155: ...CMW Service Record 154 JT5 Operator s Manual Service Performed Date Hours...